{"id":56812,"date":"2026-09-11T08:27:53","date_gmt":"2026-09-11T08:27:53","guid":{"rendered":"https:\/\/zobai.com\/?p=56812"},"modified":"2026-10-27T05:18:19","modified_gmt":"2026-10-27T05:18:19","slug":"pilot-operated-safety-valve-for-lng-service-low-temperature-and-pilot-circuit-risks","status":"publish","type":"post","link":"https:\/\/zobai.com\/ar\/blog\/pilot-operated-safety-valve-for-lng-service-low-temperature-and-pilot-circuit-risks\/","title":{"rendered":"\u0635\u0645\u0627\u0645 \u0623\u0645\u0627\u0646 \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0644\u062e\u062f\u0645\u0629 LNG: \u0645\u062e\u0627\u0637\u0631 \u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u062e\u0641\u0636\u0629 \u0648\u062f\u0627\u0626\u0631\u0629 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a"},"content":{"rendered":"<style>\n.zobai-posv-lng-article { width: 100%; max-width: 100%; overflow-wrap: anywhere; }\n.zobai-posv-lng-article .zobai-table-scroll { width: 100%; max-width: 100%; overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 1.25rem 0; }\n.zobai-posv-lng-article .zobai-table-scroll table { width: 100%; min-width: 640px; border-collapse: collapse; }\n.zobai-posv-lng-article .zobai-table-scroll th, .zobai-posv-lng-article .zobai-table-scroll td { padding: 0.75rem; vertical-align: top; text-align: left; }\n.zobai-posv-lng-article blockquote { margin: 1.25rem 0; padding-left: 1rem; }\n.zobai-posv-lng-article .zobai-engineering-scenario { margin: 1.25rem 0; padding: 1rem 1.1rem; border-left: 3px solid currentColor; }\n.zobai-posv-lng-article .zobai-faq-item { margin: 1rem 0 1.35rem; }\n@media (max-width: 390px) {\n  .zobai-posv-lng-article .zobai-table-scroll table { min-width: 600px; }\n  .zobai-posv-lng-article h2, .zobai-posv-lng-article h3, .zobai-posv-lng-article p, .zobai-posv-lng-article li { overflow-wrap: anywhere; }\n}\n<\/style>\n<article class=\"zobai-posv-lng-article\">\n<p class=\"translation-block\">\u0642\u062f \u064a\u0643\u0648\u0646 <strong>\u0635\u0645\u0627\u0645 \u0623\u0645\u0627\u0646 \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0644\u062e\u062f\u0645\u0629 \u0627\u0644\u063a\u0627\u0632 \u0627\u0644\u0637\u0628\u064a\u0639\u064a \u0627\u0644\u0645\u0633\u0627\u0644 LNG<\/strong> \u0645\u0631\u0634\u062d\u064b\u0627 \u0645\u0646\u0627\u0633\u0628\u064b\u0627\u060c \u0644\u0643\u0646 \u062a\u0635\u0646\u064a\u0641 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0644\u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u062e\u0641\u0636\u0629 \u0648\u062d\u062f\u0647<br>\n\u0644\u0627 \u064a\u062b\u0628\u062a \u0627\u0644\u0645\u0644\u0627\u0621\u0645\u0629. \u064a\u062c\u0628 \u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u0645\u0646\u0638\u0648\u0645\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0628\u062a\u0643\u0648\u064a\u0646\u0647\u0627 \u0627\u0644\u0645\u062d\u062f\u062f\u060c \u0628\u0645\u0627 \u0641\u064a \u0630\u0644\u0643:<br>\n\u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0648\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a\u060c \u0648\u0646\u0642\u0637\u0629 \u0623\u062e\u0630 \u0627\u0644\u0636\u063a\u0637 \u0648\u0645\u0633\u0627\u0631 \u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0627\u0644\u0636\u063a\u0637\u060c \u0648\u0623\u0646\u0627\u0628\u064a\u0628 \u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0648\u0627\u0644\u0648\u0635\u0644\u0627\u062a\u060c \u0648\u0645\u0648\u0627\u0646\u0639 \u0627\u0644\u062a\u0633\u0631\u0628 \u0648\u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u0644\u064a\u0646\u0629 \u0627\u0644\u0623\u062e\u0631\u0649\u060c<br>\n\u0648\u062a\u0631\u062a\u064a\u0628 \u062a\u0646\u0641\u064a\u0633 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a\u060c \u0648\u0627\u0644\u062a\u0639\u0631\u0636 \u0644\u0644\u0636\u063a\u0637 \u0627\u0644\u062e\u0644\u0641\u064a\u060c \u0648\u0627\u0644\u0638\u0631\u0648\u0641 \u0627\u0644\u062a\u064a \u064a\u062a\u0644\u0642\u0649 \u0641\u064a\u0647\u0627 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0625\u0634\u0627\u0631\u0629 \u0627\u0644\u0636\u063a\u0637 \u0641\u0639\u0644\u064a\u064b\u0627.<\/p>\n<p>\n\u062f\u0627\u0626\u0631\u0629 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u062c\u0632\u0621 \u0645\u0646 \u0648\u0638\u064a\u0641\u0629 \u0627\u0644\u062a\u062d\u0643\u0645 \u0641\u064a \u0627\u0644\u0636\u063a\u0637. \u0644\u0630\u0644\u0643 \u064a\u0645\u0643\u0646 \u0623\u0646 \u064a\u0648\u062c\u062f \u0635\u0645\u0627\u0645 \u0631\u0626\u064a\u0633\u064a \u0642\u0627\u062f\u0631 \u0639\u0644\u0649 \u062e\u062f\u0645\u0629 \u0627\u0644\u062a\u0628\u0631\u064a\u062f \u0627\u0644\u0639\u0645\u064a\u0642<br \/>\n\u0645\u0639 \u0648\u062c\u0648\u062f \u062d\u062f \u063a\u064a\u0631 \u0645\u062d\u0633\u0648\u0645 \u0644\u062f\u0631\u062c\u0629 \u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a\u060c \u0623\u0648 \u0639\u0646\u0635\u0631 \u0625\u062d\u0643\u0627\u0645 \u063a\u064a\u0631 \u0645\u0646\u0627\u0633\u0628\u060c \u0623\u0648 \u0645\u0633\u0627\u0631 \u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0642\u062f \u064a\u0646\u0633\u062f<br \/>\n\u0623\u0648 \u064a\u062a\u062c\u0645\u062f\u060c \u0623\u0648 \u062a\u0631\u062a\u064a\u0628 \u062a\u0635\u0631\u064a\u0641\/\u0636\u063a\u0637 \u062e\u0644\u0641\u064a \u0644\u0645 \u064a\u062a\u0645 \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646\u0647 \u0644\u062a\u0635\u0645\u064a\u0645 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0627\u0644\u0645\u062e\u062a\u0627\u0631.\n<\/p>\n<p>\u0627\u0644\u0633\u0624\u0627\u0644 \u0627\u0644\u0639\u0645\u0644\u064a \u0644\u064a\u0633 \u0628\u0628\u0633\u0627\u0637\u0629: \u201c\u0647\u0644 \u0647\u0630\u0627 \u0635\u0645\u0627\u0645 \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0644\u0644\u062e\u062f\u0645\u0629 \u0627\u0644\u0645\u0628\u0631\u062f\u0629\u061f\u201d \u0628\u0644:<\/p>\n<blockquote>\n<p><strong><br \/>\n\u0647\u0644 \u062b\u0628\u062a\u062a \u0645\u0644\u0627\u0621\u0645\u0629 \u0635\u0645\u0627\u0645 \u0627\u0644\u0623\u0645\u0627\u0646 \u0627\u0644\u0643\u0627\u0645\u0644 \u0627\u0644\u0645\u062c\u0647\u0632 \u0627\u0644\u0630\u064a \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0644\u0648\u0627\u062c\u0628 \u0627\u0644\u062a\u0646\u0641\u064a\u0633 \u0627\u0644\u0645\u062d\u062f\u062f \u0641\u064a \u062e\u062f\u0645\u0629 LNG\u060c,<br \/>\n\u0648\u0627\u0644\u062a\u0639\u0631\u0651\u0636 \u0644\u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629\u060c \u0648\u062d\u0627\u0644\u0629 \u0627\u0644\u0645\u0627\u0626\u0639\u060c \u0648\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631\u060c \u0648\u0627\u0644\u0636\u063a\u0637 \u0627\u0644\u062e\u0644\u0641\u064a\u060c \u0648\u0638\u0631\u0648\u0641 \u0627\u0644\u0623\u0646\u0627\u0628\u064a\u0628 \u0627\u0644\u0645\u0631\u0643\u0651\u0628\u0629\u061f<br \/>\n<\/strong><\/p>\n<\/blockquote>\n<p>\n\u064a\u0633\u062a\u062e\u062f\u0645 \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0630\u0644\u0643 \u0627\u0644\u0633\u0624\u0627\u0644 \u0644\u0641\u062d\u0635 \u0627\u0644\u0645\u0631\u0634\u062d \u0642\u0628\u0644 \u0627\u0644\u0647\u0646\u062f\u0633\u0629 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0627\u0644\u0645\u0648\u062f\u064a\u0644 \u0623\u0648 \u0645\u0631\u0627\u062c\u0639\u0629 \u0637\u0644\u0628 \u0639\u0631\u0636 \u0627\u0644\u0633\u0639\u0631. \u0648\u0647\u0648 \u0644\u0627<br \/>\n\u064a\u063a\u0646\u064a \u0639\u0646 \u062f\u0631\u0627\u0633\u0629 \u062d\u0627\u0644\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0633 \u0627\u0644\u062d\u0627\u0643\u0645\u0629\u060c \u0623\u0648 \u062d\u0633\u0627\u0628 \u0627\u0644\u0633\u0639\u0629\u060c \u0623\u0648 \u0645\u0631\u0627\u062c\u0639\u0629 \u0634\u0647\u0627\u062f\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u062c\u060c \u0623\u0648 \u0645\u0648\u0627\u0641\u0642\u0629 \u0627\u0644\u0645\u0647\u0646\u062f\u0633 \u0627\u0644\u0645\u0633\u0624\u0648\u0644.\n<\/p>\n<section>\n<h2>\u0647\u0644 \u064a\u0645\u0643\u0646 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0635\u0645\u0627\u0645 \u0623\u0645\u0627\u0646 \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0644\u062e\u062f\u0645\u0629 LNG\u061f<\/h2>\n<p>\n\u0646\u0639\u0645\u2014\u0643\u0628\u0646\u064a\u0629 <strong>\u0628\u0646\u064a\u0629 \u0645\u0631\u0634\u062d\u0629 \u0644\u0648\u0627\u062c\u0628 \u0645\u062d\u062f\u062f \u0641\u064a \u062e\u062f\u0645\u0629 LNG\u060c \u0631\u0647\u0646\u0627\u064b \u0628\u0627\u0644\u062a\u062d\u0642\u0642 \u0627\u0644\u062e\u0627\u0635 \u0628\u0643\u0644 \u062a\u062c\u0647\u064a\u0632<\/strong>.<br \/>\nPrimary sources show that pilot-operated safety valves are used in defined LNG applications, but the scope of that<br \/>\nevidence matters.\n<\/p>\n<p>\n<a href=\"https:\/\/www.iso.org\/standard\/61632.html\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">ISO 18154<\/a><br \/>\naddresses diaphragm-type pilot-operated safety valves used on LNG-carrier cargo tanks. It confirms that the architecture<br \/>\nis valid in that defined application; it is not a blanket application standard for terminals, liquefaction trains,<br \/>\ntransfer lines, storage vessels or every pilot design.\n<\/p>\n<p>\n<a href=\"https:\/\/www.api.org\/products-and-services\/standards\/important-standards-announcements\/standard521\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">\u0645\u0639\u064a\u0627\u0631 API 521<\/a> is relevant at system level because API<br \/>\nexplicitly includes LNG terminals in its pressure-relieving and depressuring-system scope. That supports relief-scenario<br \/>\nand downstream-system review, not LNG-specific qualification of a particular POSV.\n<\/p>\n<p>\n<a href=\"https:\/\/www.leser.com\/-\/media\/files\/referenzen_anwendungen\/leser_linde_lng_casestudy_en.pdf\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">LESER&#8217;s LNG POSV case study<\/a><br \/>\nshows why configuration matters: its documented cryogenic POSV solution uses project-specific thermal management of the<br \/>\npilot, including thermal decoupling and an evaporator in one application. The lesson is not that every LNG POSV needs<br \/>\nthose features; it is that pilot temperature and fluid state can be engineered variables rather than assumptions derived<br \/>\nfrom the main-valve rating.\n<\/p>\n<p>\n\u0645\u0639\u0627\u0645\u0644 <a href=\"https:\/\/www.leser.com\/en\/products\/high-efficiency-posv\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">LESER High Efficiency POSV product family<\/a><br \/>\nprovides further manufacturer context, but a product-family page does not replace configuration-specific cryogenic qualification.\n<\/p>\n<p>Keep three statements separate:<\/p>\n<p><strong>\u064a\u064f\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0641\u064a \u062e\u062f\u0645\u0629 LNG<\/strong><br \/>\n\u0644\u0627 \u064a\u0639\u0646\u064a<br \/><strong>this product family is suitable for every LNG duty<\/strong><br \/>\n\u0648\u0644\u0627 \u064a\u0639\u0646\u064a \u0623\u064a \u0645\u0646\u0647\u0645\u0627 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<br \/><strong>this exact configured valve is suitable for this relief case.<\/strong><\/p>\n<p>\nBefore a candidate moves forward, define the relief duty, expected relieving state, relevant temperatures, back pressure,<br \/>\nmain-valve and pilot materials, sensing arrangement, pilot vent arrangement and required project evidence.\n<\/p>\n<p>\n\u0627\u0644\u0643\u0644\u0645\u0629 <strong>\u0645\u0631\u0634\u062d<\/strong> is deliberate. It means the architecture deserves technical review; it does not mean<br \/>\nthe valve has already been sized, certified, accepted or approved for the project.\n<\/p>\n<p>\nReaders who need broader product-family context can review<br \/>\n<a href=\"https:\/\/zobai.com\/ar\/safety-valves\/pilot-operated-safety-valves\/\">\u0635\u0645\u0627\u0645\u0627\u062a \u0627\u0644\u0623\u0645\u0627\u0646 \u0627\u0644\u062a\u064a \u062a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a<\/a><br \/>\n\u0628\u0634\u0643\u0644 \u0645\u0646\u0641\u0635\u0644 \u0639\u0646 \u062f\u0644\u064a\u0644 \u0627\u0644\u0641\u062d\u0635 \u0627\u0644\u062e\u0627\u0635 \u0628\u0627\u0644\u063a\u0627\u0632 \u0627\u0644\u0637\u0628\u064a\u0639\u064a \u0627\u0644\u0645\u0633\u0627\u0644 LNG \u0647\u0630\u0627.\n<\/p>\n<p>For other LNG relief scenarios beyond the pilot-circuit question, see the<br \/>\n<a href=\"https:\/\/zobai.com\/ar\/applications\/lng\/\">\u062f\u0644\u064a\u0644 \u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0635\u0645\u0627\u0645\u0627\u062a \u0623\u0645\u0627\u0646 LNG<\/a>.<\/p>\n<\/section>\n<section>\n<h2>\u0644\u0645\u0627\u0630\u0627 \u0644\u0627 \u062a\u0643\u0641\u064a \u0642\u062f\u0631\u0629 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0639\u0644\u0649 \u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u062e\u0641\u0636\u0629<\/h2>\n<p>\nA pilot-operated safety valve is not one temperature-rated object. It is an assembled pressure-relief system whose<br \/>\ncomponents can have different materials, sealing elements, exposure conditions and documented limits.\n<\/p>\n<p>\nThe main relieving assembly can include the pressure-retaining body, nozzle, disc or piston and main-valve sealing<br \/>\nelements. The control side adds the pilot valve, pressure-sensing path, tubing, pilot seals, filters or restrictions<br \/>\nwhere used, and the dome\/control-pressure circuit. A temperature statement for one element should not be silently<br \/>\nextended to the others.\n<\/p>\n<p>\n<a href=\"https:\/\/dam.bakerhughes.com\/m\/a3504148807a8e1\/original\/Consolidated-3900-3900-TM-POSRV-Tech-Spec-English.pdf\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Baker Hughes Consolidated 3900\/3900 TM technical specifications<\/a><br \/>\nseparate pilot\/modulator options, main-valve configuration, remote sensing, pilot venting, back pressure and<br \/>\ncomponent-level selection data. That structure supports the engineering principle here: the exact configured POSV,<br \/>\nnot a family-level headline, is what has to be verified.\n<\/p>\n<h3>Material verification should follow the actual temperature map<\/h3>\n<p>\nCryogenic material review should follow where each component sits and what temperature and fluid state it can experience.<br \/>\nFor an LNG POSV, that means checking more than body alloy. Pilot internals, piston or diaphragm elements, soft seats,<br \/>\nO-rings or other elastomers, PTFE-based seals where used, sensing tubing and fitting materials can each have a different<br \/>\ndocumented service envelope.\n<\/p>\n<p>\nLESER&#8217;s LNG documentation gives a manufacturer-specific example: its cryogenic POSV arrangement uses a project-configured<br \/>\napproach to keep the pilot in a controlled condition and identifies a specific PTFE compound in the main-valve sealing<br \/>\narrangement. That proves component-level material and thermal management can matter; it does <strong>\u064a\u062d\u062f\u062f<\/strong> establish<br \/>\na universal LNG material recipe.\n<\/p>\n<div class=\"zobai-table-scroll\" role=\"region\" aria-label=\"Pilot-operated safety valve component verification table\" tabindex=\"0\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">\u062c\u0632\u0621 \u0645\u0646 \u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0647\u064a\u0623<\/th>\n<th scope=\"col\">What must be verified for LNG service<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0645\u062c\u0645\u0648\u0639\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0633 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629<\/td>\n<td>Exact materials, pressure boundary and allowable-temperature evidence for the selected configuration<\/td>\n<\/tr>\n<tr>\n<td>Main-valve seat \/ piston or diaphragm elements<\/td>\n<td>Low-temperature compatibility, sealing function and component-specific limits<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a<\/td>\n<td>Pilot type, internal materials, seals, operating action and documented service limits<\/td>\n<\/tr>\n<tr>\n<td>\u0645\u0633\u0627\u0631 \u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0627\u0644\u0636\u063a\u0637<\/td>\n<td>What pressure, temperature and fluid state actually reach the pilot<\/td>\n<\/tr>\n<tr>\n<td>\u0623\u0646\u0627\u0628\u064a\u0628 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0648\u0627\u0644\u062a\u062c\u0647\u064a\u0632\u0627\u062a<\/td>\n<td>Material, routing, joints and expected thermal exposure<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0641\u0644\u0627\u062a\u0631 \u0623\u0648 \u0627\u0644\u0642\u064a\u0648\u062f\u060c \u0625\u0646 \u0648\u064f\u062c\u062f\u062a<\/td>\n<td>Service suitability and effect on the pressure-sensing\/control path<\/td>\n<\/tr>\n<tr>\n<td>Pilot vent path<\/td>\n<td>Vent destination and back-pressure conditions applied to the selected pilot design<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<blockquote>\n<p><strong><br \/>\nDo not use one temperature number as evidence for the whole pilot-operated valve unless the supplier documentation<br \/>\nexplicitly supports that complete configured scope.<br \/>\n<\/strong><\/p>\n<\/blockquote>\n<aside class=\"zobai-engineering-scenario\">\n<p><strong>Illustrative engineering scenario \u2014 main valve passes the first screen, pilot materials do not.<\/strong><\/p>\n<p>\nA proposed LNG POSV has a main-valve body and primary pressure boundary documented for the expected cryogenic exposure,<br \/>\nbut the submitted datasheet does not identify the pilot soft goods or their allowable condition. The candidate stays on<br \/>\n<strong>\u062a\u0639\u0644\u064a\u0642<\/strong> until the exact pilot and seal configuration is documented and matched to its actual thermal exposure;<br \/>\nthe main-valve rating is not used as a substitute.\n<\/p>\n<\/aside>\n<p>\nThe same caution applies to product-family tables. The most extreme low-temperature value visible anywhere in a catalog<br \/>\nshould not be assigned to every pilot, seal, material combination or valve configuration.\n<\/p>\n<figure class=\"wp-block-image size-full zobai-figure\" data-image-slot=\"IMG-01\"><img loading=\"lazy\" src=\"https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-01.webp\" alt=\"\u062e\u0631\u064a\u0637\u0629 \u062a\u062d\u0642\u0642 \u0645\u0641\u0627\u0647\u064a\u0645\u064a\u0629 \u0644\u0635\u0645\u0627\u0645 \u0623\u0645\u0627\u0646 LNG \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u062a\u064f\u0638\u0647\u0631 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0648\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0648\u0645\u0633\u0627\u0631 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0648\u0627\u0644\u0623\u0646\u0627\u0628\u064a\u0628 \u0648\u0645\u0643\u0648\u0646\u0627\u062a \u0627\u0644\u0625\u062d\u0643\u0627\u0645.\" title=\"Pilot Operated Safety Valve for LNG Service: Low Temperature and Pilot Circuit Risks - IMG-01\" width=\"1200\" height=\"900\" class=\"wp-image-56877\" decoding=\"async\" srcset=\"https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-01.webp 1200w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-01-300x225.webp 300w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-01-1024x768.webp 1024w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-01-768x576.webp 768w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-01-16x12.webp 16w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-01-400x300.webp 400w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>\u062e\u0631\u064a\u0637\u0629 \u062a\u062d\u0642\u0642 \u0645\u0641\u0627\u0647\u064a\u0645\u064a\u0629 \u0644\u0635\u0645\u0627\u0645 \u0623\u0645\u0627\u0646 LNG \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u062a\u064f\u0638\u0647\u0631 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a \u0648\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0648\u0645\u0633\u0627\u0631 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0648\u0627\u0644\u0623\u0646\u0627\u0628\u064a\u0628 \u0648\u0645\u0643\u0648\u0646\u0627\u062a \u0627\u0644\u0625\u062d\u0643\u0627\u0645.<\/figcaption><\/figure>\n<\/section>\n<section>\n<h2>\u0643\u064a\u0641 \u064a\u0645\u0643\u0646 \u0644\u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u062e\u0641\u0636\u0629 \u0623\u0646 \u062a\u0647\u062f\u062f \u0633\u0644\u0627\u0645\u0629 \u0625\u0634\u0627\u0631\u0629 \u0636\u063a\u0637 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a<\/h2>\n<p>\nLow temperature becomes a pilot-circuit problem when it changes or interrupts the pressure signal the pilot needs for<br \/>\nits control function. That risk belongs to the sensing\/control circuit even though the main relief path is much larger.\n<\/p>\n<p>At a simplified functional level:<\/p>\n<p><strong>protected-system pressure \u2192 pressure pickup \u2192 sensing path \u2192 pilot \u2192 dome\/control pressure \u2192 main-valve response<\/strong><\/p>\n<p>Every element in that chain has to preserve the pressure information that the pilot is intended to act on.<\/p>\n<p>\n<a href=\"https:\/\/dam.bakerhughes.com\/m\/6b2933aeddb3989a\/original\/Consolidated-2900-Gen-II-POSRV-Manual-English.pdf\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Baker Hughes Consolidated 2900 POSRV operating instructions<\/a><br \/>\nidentify the failure mechanism directly: a pilot sensing line that becomes clogged or frozen can isolate system pressure<br \/>\nfrom the pilot, preventing the pilot from correctly detecting protected-system pressure and carrying out the intended<br \/>\nrelief response.\n<\/p>\n<p>\nThat warning identifies the functional consequence without creating a generic LNG threshold. The design task is to decide<br \/>\nwhether the actual installation has a credible sensing-path blockage or freeze condition and, if so, what manufacturer-approved<br \/>\narrangement controls the risk.\n<\/p>\n<aside class=\"zobai-engineering-scenario\">\n<p><strong>Illustrative engineering scenario \u2014 a cold sensing path becomes the weak link.<\/strong><\/p>\n<p>\nThe main valve has documented cryogenic suitability, but a remote pilot sensing line is routed through a colder zone and<br \/>\nits blockage\/freeze exposure has not been evaluated. If the path becomes restricted, the pilot can be isolated from<br \/>\nrepresentative vessel pressure even while the main valve remains mechanically intact. The preventive action is to review<br \/>\nthe actual pickup point, routing, fluid condition and manufacturer-approved thermal-management or freeze-protection arrangement.\n<\/p>\n<\/aside>\n<p>\n\u064a\u0645\u0643\u0646 \u0644\u0644\u0642\u0631\u0627\u0621 \u0627\u0644\u0630\u064a\u0646 \u064a\u062d\u062a\u0627\u062c\u0648\u0646 \u0625\u0644\u0649 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0639\u0627\u0645 \u0627\u0644\u0643\u0627\u0645\u0644 \u0645\u0631\u0627\u062c\u0639\u0629<br \/>\n<a href=\"https:\/\/zobai.com\/ar\/blog\/how-does-a-pilot-operated-safety-valve-work\/\">\u0643\u064a\u0641 \u064a\u0639\u0645\u0644 \u0635\u0645\u0627\u0645 \u0627\u0644\u0623\u0645\u0627\u0646 \u0627\u0644\u0630\u064a \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a<\/a>;<br \/>\nthis article uses only the operating principle required to explain the LNG screening risk.\n<\/p>\n<figure class=\"wp-block-image size-full zobai-figure\" data-image-slot=\"IMG-02\"><img loading=\"lazy\" src=\"https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-02.webp\" alt=\"\u0645\u0633\u0627\u0631 \u0625\u0634\u0627\u0631\u0629 \u0627\u0644\u0636\u063a\u0637 \u0645\u0646 \u0645\u0639\u062f\u0627\u062a LNG \u0627\u0644\u0645\u062d\u0645\u064a\u0629 \u0639\u0628\u0631 \u062e\u0637 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0648\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0625\u0644\u0649 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u060c \u0645\u0639 \u0625\u0628\u0631\u0627\u0632 \u0627\u062d\u062a\u0645\u0627\u0644 \u0648\u062c\u0648\u062f \u0627\u0646\u0633\u062f\u0627\u062f \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631.\" title=\"Pilot Operated Safety Valve for LNG Service: Low Temperature and Pilot Circuit Risks - IMG-02\" width=\"1200\" height=\"900\" class=\"wp-image-56878\" decoding=\"async\" srcset=\"https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-02.webp 1200w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-02-300x225.webp 300w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-02-1024x768.webp 1024w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-02-768x576.webp 768w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-02-16x12.webp 16w, https:\/\/zobai.com\/wp-content\/uploads\/2026\/09\/pilot-operated-safety-valve-lng-img-02-400x300.webp 400w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>\u0645\u0633\u0627\u0631 \u0625\u0634\u0627\u0631\u0629 \u0627\u0644\u0636\u063a\u0637 \u0645\u0646 \u0645\u0639\u062f\u0627\u062a LNG \u0627\u0644\u0645\u062d\u0645\u064a\u0629 \u0639\u0628\u0631 \u062e\u0637 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0648\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0625\u0644\u0649 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u060c \u0645\u0639 \u0625\u0628\u0631\u0627\u0632 \u0627\u062d\u062a\u0645\u0627\u0644 \u0648\u062c\u0648\u062f \u0627\u0646\u0633\u062f\u0627\u062f \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631.<\/figcaption><\/figure>\n<h3>\u0644\u0627 \u062a\u062f\u0645\u062c \u0622\u0644\u064a\u0627\u062a \u0645\u062e\u062a\u0644\u0641\u0629 \u0641\u064a \u062e\u0637\u0631 \u0648\u0627\u062d\u062f<\/h3>\n<p><strong>\u0627\u0646\u0633\u062f\u0627\u062f<\/strong> \u064a\u0635\u0641 \u0645\u0633\u0627\u0631 \u0636\u063a\u0637 \u0645\u0642\u064a\u0651\u062f \u0623\u0648 \u0645\u063a\u0644\u0642.<\/p>\n<p><strong>\u0627\u0644\u062a\u062c\u0645\u062f<\/strong> can be one cause of blockage when the actual local fluid and thermal conditions allow it.<\/p>\n<p>\nParticulate contamination, deposits or process contamination can restrict a sensing path through different mechanisms.<br \/>\nThose mechanisms should be identified from the actual service rather than collapsed into the word \u201cfreezing.\u201d\n<\/p>\n<p>\nManufacturer guidance in hydrocarbon service can discuss hydrate or contamination risks, but that does not justify<br \/>\ndescribing hydrates as a routine LNG pilot-circuit failure. Likewise, a freeze-protection instruction written for another<br \/>\nservice demonstrates a mechanism; it does not automatically prove that the same mechanism exists in a particular LNG installation.\n<\/p>\n<p>\nCurrent source evidence does not support a universal statement that flashing or two-phase flow in every LNG sensing line<br \/>\ncauses one predictable pilot failure mode. The relevant question is whether the pressure and fluid condition delivered<br \/>\nto the pilot remain representative for the selected design.\n<\/p>\n<blockquote>\n<p><strong><br \/>\nThe pressure condition presented to the pilot must remain representative of the protected system under the defined<br \/>\noperating and relieving conditions.<br \/>\n<\/strong><\/p>\n<\/blockquote>\n<p>\nIf a proposed design depends on a sensing path whose local temperature, fluid state, blockage risk or thermal management<br \/>\nremains unresolved, that uncertainty should remain visible in the selection review.\n<\/p>\n<\/section>\n<section>\n<h2>\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u062c\u0628 \u0641\u062d\u0635\u0647 \u0641\u064a \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0648\u062f\u0627\u0626\u0631\u0629 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631\u061f<\/h2>\n<p>\nOnce the pilot path is treated as part of the pressure-protection function, the review can move from generic<br \/>\n\u201ccryogenic suitability\u201d to specific configuration questions.\n<\/p>\n<div class=\"zobai-table-scroll\" role=\"region\" aria-label=\"Pilot and sensing circuit verification matrix\" tabindex=\"0\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">\u062a\u062d\u0642\u0642 \u0645\u0646<\/th>\n<th scope=\"col\">\u0644\u0645\u0627\u0630\u0627 \u064a\u063a\u064a\u0631 \u0627\u0644\u0642\u0631\u0627\u0631<\/th>\n<th scope=\"col\">\u0627\u0644\u0623\u062f\u0644\u0629 \u0627\u0644\u0645\u0637\u0644\u0648\u0628 \u0627\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u064a\u0647\u0627<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0645\u0648\u0642\u0639 \u0627\u0644\u062a\u0642\u0627\u0637 \u0627\u0644\u0636\u063a\u0637<\/td>\n<td>\u064a\u062d\u062f\u062f \u0636\u063a\u0637 \u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0630\u064a \u064a\u0633\u062a\u0634\u0639\u0631\u0647 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0641\u0639\u0644\u064a\u064b\u0627<\/td>\n<td>P&amp;ID, connection point and exact supplier arrangement<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0627\u0644\u0645\u062f\u0645\u062c \u0623\u0648 \u0639\u0646 \u0628\u064f\u0639\u062f<\/td>\n<td>Changes the physical pressure-sensing path and its exposure<\/td>\n<td>Exact valve\/pilot configuration<\/td>\n<\/tr>\n<tr>\n<td>\u0645\u0633\u0627\u0631 \u062e\u0637 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0639\u0646 \u0628\u064f\u0639\u062f\u060c \u062d\u064a\u062b\u0645\u0627 \u064a\u064f\u0633\u062a\u062e\u062f\u0645<\/td>\n<td>Adds tubing length, elevation, fittings and thermal-routing variables<\/td>\n<td>Routing, equivalent length, elevation change and manufacturer review where required<\/td>\n<\/tr>\n<tr>\n<td>\u0641\u0644\u062a\u0631 \u062a\u063a\u0630\u064a\u0629 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a\u060c \u062d\u064a\u062b\u0645\u0627 \u064a\u064f\u0633\u062a\u062e\u062f\u0645<\/td>\n<td>Becomes part of the control path and can itself become a restriction point<\/td>\n<td>\u062a\u0643\u0648\u064a\u0646 \u0627\u0644\u0641\u0644\u062a\u0631 \u0648\u0623\u0633\u0627\u0633 \u0627\u0644\u062e\u062f\u0645\u0629<\/td>\n<\/tr>\n<tr>\n<td>\u0648\u062c\u0647\u0629 \u062a\u0646\u0641\u064a\u0633 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a<\/td>\n<td>Determines which downstream pressure acts on the pilot vent arrangement<\/td>\n<td>Vent routing and selected-pilot back-pressure documentation<\/td>\n<\/tr>\n<tr>\n<td>\u062a\u0631\u062a\u064a\u0628 \u0645\u0646\u0639 \u0627\u0644\u062a\u062f\u0641\u0642 \u0627\u0644\u0639\u0643\u0633\u064a\u060c \u0639\u0646\u062f \u0627\u0644\u0627\u0642\u062a\u0636\u0627\u0621<\/td>\n<td>\u0642\u062f \u064a\u0643\u0648\u0646 \u0645\u0647\u0645\u064b\u0627 \u0641\u064a \u0638\u0631\u0648\u0641 \u0636\u063a\u0637 \u0645\u0639\u064a\u0646\u0629<\/td>\n<td>Supplier application review for the selected pilot design<\/td>\n<\/tr>\n<tr>\n<td>\u0645\u0648\u0627\u062f \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0648\u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u062f\u0627\u062e\u0644\u064a\u0629<\/td>\n<td>May have a different service envelope from the main valve<\/td>\n<td>Component\/configuration documents<\/td>\n<\/tr>\n<tr>\n<td>\u0623\u062e\u062a\u0627\u0645 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0648\u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0631\u0626\u064a\u0633\u064a<\/td>\n<td>Low-temperature limits and sealing behavior are component-specific<\/td>\n<td>\u0625\u062b\u0628\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0638\u0631\u0648\u0641 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0645\u0633\u0645\u0648\u062d \u0628\u0647\u0627<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0623\u0646\u0627\u0628\u064a\u0628 \u0648\u0627\u0644\u062a\u062c\u0647\u064a\u0632\u0627\u062a<\/td>\n<td>The complete control circuit must remain suitable at the expected exposure<\/td>\n<td>Material, fitting and configuration evidence<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3>\u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0639\u0646 \u0628\u0639\u062f \u062a\u0631\u062a\u064a\u0628 \u0647\u0646\u062f\u0633\u064a \u0648\u0644\u064a\u0633 \u062a\u0631\u0642\u064a\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u0629<\/h3>\n<p>\nRemote pressure sensing is legitimate, but it should not be recommended simply because the service is LNG. It adds a<br \/>\nphysical path between the protected system and pilot, so routing, length, fittings, elevation and local thermal exposure<br \/>\nbecome part of the review.\n<\/p>\n<p>\n<a href=\"https:\/\/dam.bakerhughes.com\/m\/50529bbba719fce2\/original\/Consolidated-2900-2900-TM-POSRV-Tech-Spec-English.pdf\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Baker Hughes 2900\/2900 TM ordering data<\/a><br \/>\nask for remote-sensing information including sensing-line length, equivalent length and elevation change, while separately<br \/>\nrequesting built-up and superimposed back pressure, pilot sense and pilot vent configuration. These are engineering inputs,<br \/>\nnot cosmetic options.\n<\/p>\n<blockquote>\n<p><strong><br \/>\nWhere must the pilot sense representative protected-system pressure, and what physical path connects that point to the pilot?<br \/>\n<\/strong><\/p>\n<\/blockquote>\n<aside class=\"zobai-engineering-scenario\">\n<p><strong>Illustrative engineering scenario \u2014 remote sensing is specified but not engineered.<\/strong><\/p>\n<p>\nAn RFQ says \u201cremote sensing required\u201d but gives no pickup location, routing, equivalent length or elevation difference.<br \/>\nThe configuration should remain on <strong>\u062a\u0639\u0644\u064a\u0642<\/strong> until the sensing geometry and service conditions are defined<br \/>\nwell enough for the selected manufacturer to review.\n<\/p>\n<\/aside>\n<h3>\u0627\u0644\u0645\u0631\u0634\u062d\u0627\u062a \u062a\u062d\u0644 \u0645\u0634\u0643\u0644\u0629 \u0645\u062d\u062f\u062f\u0629\u060c \u0648\u0644\u064a\u0633 \u201c\u062e\u062f\u0645\u0629 LNG\u201d \u0628\u0634\u0643\u0644 \u0639\u0627\u0645<\/h3>\n<p>\nPilot supply filters appear as options in documented POSV configurations. They can be relevant when particulate contamination<br \/>\nis a credible concern, but a filter should not become a mandatory LNG checkbox.\n<\/p>\n<p>\nIf a filter is proposed, verify what condition it addresses, how it affects the sensing\/control path, what inspection or<br \/>\nmaintenance it requires, and whether it is included in the exact supplier configuration.\n<\/p>\n<h3>\u0631\u0627\u062c\u0639 \u062a\u0646\u0641\u064a\u0633 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0645\u0639 \u0627\u0644\u0636\u063a\u0637 \u0627\u0644\u062e\u0644\u0641\u064a<\/h3>\n<p>\nPilot venting and outlet pressure belong in the same configuration review. Baker Hughes technical data for the Consolidated<br \/>\n3900 series show that back-pressure behavior changes with pilot design and with whether the pilot vent is routed to the<br \/>\nmain-valve outlet, to atmosphere or to another documented location. The published numerical limits are product-specific<br \/>\nand are not generalized here.\n<\/p>\n<p>\nThe system review therefore needs two related answers: what pressure the main valve sees at its outlet, and what pressure<br \/>\nacts on the pilot vent for the selected configuration. If a common discharge header is involved, expected superimposed<br \/>\nand built-up back pressure must be part of the sizing\/selection basis.\n<\/p>\n<aside class=\"zobai-engineering-scenario\">\n<p><strong>Illustrative engineering scenario \u2014 the discharge system changes after valve screening.<\/strong><\/p>\n<p>\nA POSV was screened with one downstream-pressure basis, but the project later ties its discharge into a common header.<br \/>\nIf that change raises or varies the pressure seen by the main outlet or pilot vent, the original selection should not be<br \/>\nassumed to remain valid. Recheck the selected pilot&#8217;s vent arrangement, documented back-pressure envelope and any required<br \/>\ncapacity correction against the revised system.\n<\/p>\n<\/aside>\n<blockquote>\n<p><strong><br \/>\nBack pressure is a property of the installed relief system as well as a valve-selection input; the selected pilot vent<br \/>\narrangement has to be checked against the actual downstream-pressure conditions.<br \/>\n<\/strong><\/p>\n<\/blockquote>\n<h3>\u0645\u0646\u0639 \u0627\u0644\u062a\u062f\u0641\u0642 \u0627\u0644\u0639\u0643\u0633\u064a \u0645\u0634\u0631\u0648\u0637<\/h3>\n<p>\nBackflow-preventer arrangements are documented as optional configurations rather than universal equipment. Whether one<br \/>\nis needed depends on the selected pilot architecture and the actual pressure relationships across the installed system.\n<\/p>\n<p>\nThe same logic applies to the rest of the pilot circuit: configuration names should trigger engineering verification,<br \/>\nnot automatic purchasing decisions.\n<\/p>\n<\/section>\n<section>\n<h2>\u0645\u0627\u0630\u0627 \u062a\u064f\u062b\u0628\u062a \u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u2014 \u0648\u0645\u0627\u0630\u0627 \u0644\u0627 \u062a\u064f\u062b\u0628\u062a\u061f<\/h2>\n<p>\nStandards are essential evidence, but different standards answer different questions. A defensible LNG POSV review<br \/>\nseparates product-standard scope, overpressure-protection rules, relief-system guidance and project-specific conformity evidence.\n<\/p>\n<blockquote>\n<p><strong><br \/>\nstandard relevance \u2260 certification or conformity evidence \u2260 LNG application suitability \u2260 project acceptance<br \/>\n<\/strong><\/p>\n<\/blockquote>\n<p>\n<a href=\"https:\/\/www.iso.org\/standard\/50827.html\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">ISO 4126-4<\/a><br \/>\nspecifies general requirements for pilot-operated safety valves. ISO describes it as a product standard rather than an<br \/>\napplication standard and states that the standard itself places no temperature limitation. Those points must be read<br \/>\ntogether: absence of a standard-level temperature limit does not prove that every POSV configuration is suitable for LNG.\n<\/p>\n<h3>\u0642\u062f \u062a\u0643\u0648\u0646 \u0627\u0644\u0645\u0648\u0627\u0635\u0641\u0627\u062a \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 LNG \u0623\u0636\u064a\u0642 \u0646\u0637\u0627\u0642\u064b\u0627 \u0628\u0643\u062b\u064a\u0631<\/h3>\n<p>\n<a href=\"https:\/\/www.iso.org\/standard\/61632.html\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">ISO 18154<\/a><br \/>\nis application-specific but narrow: it addresses diaphragm-type pilot-operated safety valves on LNG-carrier cargo tanks.<br \/>\nIt is evidence for that defined marine application, not a blanket rule for every LNG facility or pilot architecture.\n<\/p>\n<h3>\u0623\u064a\u0646 \u062a\u062a\u0648\u0627\u0641\u0642 API 520<\/h3>\n<p>\n<a href=\"https:\/\/www.api.org\/products-and-services\/standards\/important-standards-announcements\/520parti\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">API 520 \u0627\u0644\u062c\u0632\u0621 \u0627\u0644\u0623\u0648\u0644<\/a> provides sizing and selection requirements within<br \/>\nits scope, while <a href=\"https:\/\/www.api.org\/products-and-services\/standards\/important-standards-announcements\/520part-ii\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">API 520 \u0627\u0644\u062c\u0632\u0621 \u0627\u0644\u062b\u0627\u0646\u064a<\/a> addresses installation. API&#8217;s current catalog lists<br \/>\nthe published editions, while its <a href=\"https:\/\/www.api.org\/products-and-services\/standards\/standards-plan\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">standards plan<\/a> also shows later editions under development; edition-specific requirements<br \/>\nshould therefore be checked against the project&#8217;s adopted basis.\n<\/p>\n<p>\n<a href=\"https:\/\/www.api.org\/products-and-services\/standards\/important-standards-announcements\/standard521\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">API 521<\/a> provides pressure-relieving and depressuring-system guidance<br \/>\nand explicitly includes LNG terminals in its stated scope. It is particularly relevant to relief-scenario and downstream-system<br \/>\ncontext, including how the back-pressure basis is established.\n<\/p>\n<p>\n<a href=\"https:\/\/www.asme.org\/codes-standards\/bpvc-standards\/bpvc-2025\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">ASME BPVC \u0627\u0644\u0642\u0633\u0645 XIII<\/a> is the current ASME overpressure-protection section for<br \/>\npressurized equipment. Where an ASME construction basis is adopted, it belongs in the code\/conformity review; it is not<br \/>\nan LNG-specific pilot-circuit or material qualification.\n<\/p>\n<p>\nFor in-service inspection and repair planning,<br \/>\n<a href=\"https:\/\/www.api.org\/-\/media\/files\/publications\/2025-catalog\/06_refining_2025.pdf\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">API RP 576<\/a> covers inspection and repair practices for pressure-relieving devices,<br \/>\nincluding pilot-operated pressure-relief valves. It does not justify one universal inspection interval for every LNG project.\n<\/p>\n<p>\nFor a broader standards overview without expanding this article beyond its LNG POSV scope, see the<br \/>\n<a href=\"https:\/\/zobai.com\/ar\/blog\/safety-valve-standards-guide\/\">\u062f\u0644\u064a\u0644 \u0645\u0639\u0627\u064a\u064a\u0631 \u0635\u0645\u0627\u0645\u0627\u062a \u0627\u0644\u0623\u0645\u0627\u0646<\/a>.\n<\/p>\n<p>For supplier evaluation, keep four questions separate:<\/p>\n<ol>\n<li>Which technical standards are relevant to this pressure-relief system and product?<\/li>\n<li>What certification, conformity or test evidence exists for the exact proposed configuration?<\/li>\n<li>Does that configuration satisfy the defined LNG duty, temperature exposure, pilot circuit and back pressure?<\/li>\n<li>Does the purchaser, responsible engineer and applicable jurisdiction accept the evidence package?<\/li>\n<\/ol>\n<p>\u0642\u0627\u0626\u0645\u0629 \u0637\u0648\u064a\u0644\u0629 \u0645\u0646 \u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0644\u0627 \u062a\u063a\u0646\u064a \u0639\u0646 \u0647\u0630\u0647 \u0627\u0644\u0625\u062c\u0627\u0628\u0627\u062a.<\/p>\n<\/section>\n<section>\n<h2>When Should an LNG POSV Candidate Proceed, Be Held, or Be Rejected?<\/h2>\n<p>\nThe following <strong>PROCEED \/ HOLD \/ REJECT<\/strong> logic is an engineering screening framework used in this article.<br \/>\nIt is not an ISO, API, ASME or regulatory classification.\n<\/p>\n<h3>\u0645\u062a\u0627\u0628\u0639\u0629<\/h3>\n<p>\n\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <strong>\u0645\u062a\u0627\u0628\u0639\u0629<\/strong> when enough defined information exists to continue into detailed model-specific engineering<br \/>\nor supplier review.\n<\/p>\n<ul>\n<li>relief duty and required capacity;<\/li>\n<li>LNG composition or defined fluid basis and expected relieving state;<\/li>\n<li>operating, relieving and relevant component temperatures;<\/li>\n<li>\u0627\u0644\u0636\u063a\u0637 \u0627\u0644\u062e\u0644\u0641\u064a \u0627\u0644\u0645\u062a\u0648\u0642\u0639 \u0648\u0627\u0644\u0645\u062a\u0631\u0627\u0643\u0645\u061b;<\/li>\n<li>pilot type and operating action;<\/li>\n<li>pressure pickup and sensing arrangement;<\/li>\n<li>main-valve, pilot, tubing and fitting materials;<\/li>\n<li>seals and other soft goods;<\/li>\n<li>pilot vent arrangement;<\/li>\n<li>installation constraints affecting sensing or thermal exposure;<\/li>\n<li>applicable standards and project-required evidence.<\/li>\n<\/ul>\n<p><strong>PROCEED does not mean approved.<\/strong> It means the candidate is defined well enough for meaningful review.<\/p>\n<h3>\u062a\u0639\u0644\u064a\u0642<\/h3>\n<p>\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <strong>\u062a\u0639\u0644\u064a\u0642<\/strong> when a missing fact could materially change suitability.<\/p>\n<ul>\n<li>actual pilot or sensing-line temperature exposure is unknown;<\/li>\n<li>pilot or main-valve soft-good limits are unresolved;<\/li>\n<li>the pressure pickup or sensing arrangement is undefined;<\/li>\n<li>a remote sensing path has not been routed or reviewed;<\/li>\n<li>pilot venting and back-pressure interaction remain unresolved;<\/li>\n<li>a product-family temperature range cannot be tied to the exact proposed configuration;<\/li>\n<li>the expected fluid state at the pilot is not established where the configuration depends on it;<\/li>\n<li>required conformity, certification or test evidence has not been supplied.<\/li>\n<\/ul>\n<blockquote>\n<p><strong>Unknown is not the same as unsuitable.<\/strong><\/p>\n<\/blockquote>\n<h3>\u0631\u0641\u0636<\/h3>\n<p>\u0627\u0633\u062a\u062e\u062f\u0627\u0645 <strong>\u0631\u0641\u0636<\/strong> only when a documented mismatch has been established.<\/p>\n<p>\nExamples include a component expected to operate outside its documented limit, a pilot\/sensing arrangement that cannot<br \/>\nsatisfy a required project condition, a back-pressure condition outside the selected configuration&#8217;s documented basis,<br \/>\nor a candidate that fails the required relieving-duty verification.\n<\/p>\n<div class=\"zobai-table-scroll\" role=\"region\" aria-label=\"LNG POSV candidate screening status\" tabindex=\"0\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">\u062d\u0627\u0644\u0629 \u0627\u0644\u0641\u0631\u0632<\/th>\n<th scope=\"col\">\u0627\u0644\u0645\u0639\u0646\u0649<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>\u0645\u062a\u0627\u0628\u0639\u0629<\/strong><\/td>\n<td>Enough evidence exists to continue detailed engineering and model review<\/td>\n<\/tr>\n<tr>\n<td><strong>\u062a\u0639\u0644\u064a\u0642<\/strong><\/td>\n<td>A decision-critical fact or evidence item remains unresolved<\/td>\n<\/tr>\n<tr>\n<td><strong>\u0631\u0641\u0636<\/strong><\/td>\n<td>A documented mismatch with the defined LNG service has been established<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\nThis framework organizes the review without pretending to replace formal sizing, certification, purchaser acceptance<br \/>\nor responsible-engineer approval.\n<\/p>\n<\/section>\n<section>\n<h2>What Should an LNG Pilot-Operated Valve RFQ Include?<\/h2>\n<p>\nAn LNG POSV RFQ should define the <strong>relief duty, process state, low-temperature exposure, pilot circuit and<br \/>\ndownstream conditions<\/strong>, not only nominal valve size, medium and set pressure.\n<\/p>\n<p>\nOriginal manufacturer ordering data support that approach. Baker Hughes POSV ordering information asks for fluid\/service<br \/>\nand relief inputs such as required capacity, operating and relieving temperatures, set pressure, built-up and superimposed<br \/>\nback pressure, pilot sense, pilot vent and remote-sensing geometry where applicable. Those inputs can change the configuration.\n<\/p>\n<h3>Information the buyer should provide<\/h3>\n<p><strong>\u0648\u0627\u062c\u0628 \u0627\u0644\u062a\u0646\u0641\u064a\u0633<\/strong><\/p>\n<ul>\n<li>protected equipment or service;<\/li>\n<li>credible relief case;<\/li>\n<li>\u0633\u0639\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0633 \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629\u061b;<\/li>\n<li>\u0623\u0633\u0627\u0633 \u0636\u063a\u0637 \u0627\u0644\u0636\u0628\u0637\u061b;<\/li>\n<li>applicable project overpressure basis where defined.<\/li>\n<\/ul>\n<p><strong>Process and cryogenic conditions<\/strong><\/p>\n<ul>\n<li>LNG composition or defined fluid basis;<\/li>\n<li>\u0636\u063a\u0637 \u0627\u0644\u062a\u0634\u063a\u064a\u0644\u061b;<\/li>\n<li>\u062f\u0631\u062c\u0629 \u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u062a\u0634\u063a\u064a\u0644\u061b;<\/li>\n<li>\u062f\u0631\u062c\u0629 \u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0633;<\/li>\n<li>expected relieving fluid state;<\/li>\n<li>ambient or local thermal conditions where they affect pilot\/sensing components.<\/li>\n<\/ul>\n<p><strong>\u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u062b\u0628\u062a<\/strong><\/p>\n<ul>\n<li>\u0627\u0644\u0636\u063a\u0637 \u0627\u0644\u062e\u0644\u0641\u064a \u0627\u0644\u0645\u062a\u062c\u0645\u0639\u061b;<\/li>\n<li>\u0627\u0644\u0636\u063a\u0637 \u0627\u0644\u062e\u0644\u0641\u064a \u0627\u0644\u0645\u0641\u0631\u0648\u0636 \u0645\u0646 \u0627\u0644\u0646\u0638\u0627\u0645\u061b<\/li>\n<li>common-header or discharge-system conditions;<\/li>\n<li>installation constraints affecting tubing, venting or thermal exposure.<\/li>\n<\/ul>\n<p><strong>Pilot and sensing basis<\/strong><\/p>\n<ul>\n<li>proposed pressure pickup location;<\/li>\n<li>integral or remote sensing requirement, if already defined;<\/li>\n<li>known sensing-line length, routing, fittings and elevation change for remote sensing;<\/li>\n<li>pilot vent destination;<\/li>\n<li>known contamination, blockage or freeze risks requiring manufacturer review.<\/li>\n<\/ul>\n<p><strong>Project evidence<\/strong><\/p>\n<ul>\n<li>applicable design standard and adopted edition where specified;<\/li>\n<li>\u0645\u0648\u0627\u0635\u0641\u0627\u062a \u0627\u0644\u0645\u0634\u062a\u0631\u064a\u061b;<\/li>\n<li>required conformity, certification, test and documentation package.<\/li>\n<\/ul>\n<h3>Evidence the supplier should return<\/h3>\n<p>The supplier should identify the exact candidate configuration rather than answer only at product-family level.<\/p>\n<ul>\n<li>\u0627\u0644\u0637\u0631\u0627\u0632 \u0648\u0627\u0644\u062a\u0643\u0648\u064a\u0646 \u0628\u0627\u0644\u062a\u062d\u062f\u064a\u062f\u061b;<\/li>\n<li>pilot type and operating action;<\/li>\n<li>main-valve pressure-boundary and internal materials;<\/li>\n<li>pilot materials and internals;<\/li>\n<li>seat, piston\/diaphragm and other soft-good materials where applicable;<\/li>\n<li>tubing and fitting configuration;<\/li>\n<li>\u062a\u0631\u062a\u064a\u0628 \u0627\u0633\u062a\u0634\u0639\u0627\u0631 \u0627\u0644\u0636\u063a\u0637\u061b;<\/li>\n<li>pilot vent arrangement;<\/li>\n<li>filter, heat exchanger, thermal-management or backflow configuration where used;<\/li>\n<li>documented allowable conditions for the relevant configured components;<\/li>\n<li>back-pressure basis and any configuration-specific restrictions or corrections;<\/li>\n<li>sizing or certified-capacity evidence required by the project;<\/li>\n<li>project-required test, conformity or certification documentation.<\/li>\n<\/ul>\n<blockquote>\n<p><strong><br \/>\nBuyer inputs define the problem. Supplier evidence shows whether the exact configured valve can solve that problem.<br \/>\n<\/strong><\/p>\n<\/blockquote>\n<p>\n\u201cService: LNG\u201d is not enough information to complete either side of that exchange. Likewise, <strong>\u0645\u0628\u0631\u0651\u062f<\/strong><br \/>\nis not a substitute for defining which configuration, pilot, sensing path, soft goods, back-pressure condition and actual<br \/>\ntemperatures the supplier is confirming.\n<\/p>\n<p>\nReaders who need the broader valve-selection workflow can continue with the<br \/>\n<a href=\"https:\/\/zobai.com\/ar\/blog\/safety-valve-selection-guide\/\">\u062f\u0644\u064a\u0644 \u0627\u062e\u062a\u064a\u0627\u0631 \u0635\u0645\u0627\u0645\u0627\u062a \u0627\u0644\u0623\u0645\u0627\u0646<\/a>.\n<\/p>\n<p>\nPreparing an LNG POSV inquiry?<br \/>\n<a href=\"https:\/\/zobai.com\/ar\/contacts\/\">Send the defined relief duty, operating and relieving conditions, expected back pressure,<br \/>\nfluid state and pilot\/sensing requirements to ZOBAI<\/a> for supplier review and RFQ preparation against the actual service conditions.\n<\/p>\n<\/section>\n<section aria-labelledby=\"lng-posv-faq\">\n<h2 id=\"lng-posv-faq\">FAQ: LNG Pilot-Operated Safety Valve Selection<\/h2>\n<div class=\"zobai-faq-item\">\n<h3>Can a pilot-operated safety valve be used for LNG service?<\/h3>\n<p>\nYes, but only after the exact configuration is verified for the defined LNG duty. ISO 18154 confirms a narrow LNG-carrier<br \/>\ncargo-tank application for diaphragm-type pilot-operated safety valves, while manufacturer documentation shows purpose-built<br \/>\ncryogenic POSV configurations. Neither source means every POSV is automatically suitable for LNG.\n<\/p>\n<\/div>\n<div class=\"zobai-faq-item\">\n<h3>Why is the main-valve cryogenic rating not enough?<\/h3>\n<p>\nBecause the pilot, sensing path, tubing, fittings and soft goods can have different materials, temperatures and service<br \/>\nlimits from the main valve. Suitability has to be demonstrated for the complete configured valve and its actual thermal exposure.\n<\/p>\n<\/div>\n<div class=\"zobai-faq-item\">\n<h3>What happens if an LNG POSV sensing line freezes or becomes blocked?<\/h3>\n<p>\nA restricted sensing line can isolate the pilot from representative protected-system pressure. Baker Hughes operating<br \/>\ninstructions identify clogged or frozen sensing lines as a condition that can prevent the pilot from correctly detecting<br \/>\nsystem pressure. Whether that mechanism is credible in a specific LNG installation depends on actual fluid, contamination<br \/>\nand thermal conditions.\n<\/p>\n<\/div>\n<div class=\"zobai-faq-item\">\n<h3>How does back pressure affect an LNG pilot-operated safety valve?<\/h3>\n<p>\nBack pressure must be checked against the selected pilot design and vent arrangement. Manufacturer technical data show<br \/>\nthat behavior can differ depending on where the pilot vents and whether back pressure is constant or variable. A numerical<br \/>\nlimit from one product should not be applied to another configuration.\n<\/p>\n<\/div>\n<div class=\"zobai-faq-item\">\n<h3>Does ISO 4126-4 prove that a POSV is suitable for cryogenic LNG temperature?<\/h3>\n<p>\nNo. ISO 4126-4 is a general product standard for pilot-operated safety valves and says it is not an application standard.<br \/>\nIts lack of a standard-level temperature limitation does not prove service suitability for a particular LNG configuration.\n<\/p>\n<\/div>\n<div class=\"zobai-faq-item\">\n<h3>What should an LNG POSV supplier confirm before the RFQ is closed?<\/h3>\n<p>\nThe supplier should identify the exact model and pilot configuration; materials and soft goods; sensing and vent arrangement;<br \/>\napplicable configured-component limits; back-pressure basis; sizing or capacity evidence; and the conformity, certification<br \/>\nor test documents required by the project.\n<\/p>\n<\/div>\n<\/section>\n<\/article>\n<p><script type=\"application\/ld+json\">{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"BlogPosting\",\n    \"headline\": \"Pilot Operated Safety Valve for LNG Service: Low Temperature and Pilot Circuit Risks\",\n    \"description\": \"Screen a pilot-operated safety valve for LNG service by checking cryogenic temperature exposure, materials, sensing and pilot circuits, back pressure, installation risks and RFQ evidence.\",\n    \"mainEntityOfPage\": {\n        \"@type\": \"WebPage\",\n        \"@id\": \"https:\\\/\\\/zobai.com\\\/blog\\\/pilot-operated-safety-valve-for-lng-service-low-temperature-and-pilot-circuit-risks\\\/\"\n    },\n    \"publisher\": {\n        \"@type\": \"Organization\",\n        \"name\": \"ZOBAI\",\n        \"url\": \"https:\\\/\\\/zobai.com\\\/\"\n    }\n}<\/script><\/p>","protected":false},"excerpt":{"rendered":"<p>\u0627\u062e\u062a\u0631 \u0635\u0645\u0627\u0645 \u0623\u0645\u0627\u0646 \u064a\u0639\u0645\u0644 \u0628\u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a \u0644\u062e\u062f\u0645\u0629 LNG \u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646 \u0627\u0644\u062a\u0639\u0631\u0636 \u0644\u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u062e\u0641\u0636\u0629\u060c \u0648\u062e\u0637\u0648\u0637 \u0627\u0644\u0627\u0633\u062a\u0634\u0639\u0627\u0631\u060c \u0648\u0623\u062e\u062a\u0627\u0645 \u0627\u0644\u0628\u0627\u064a\u0644\u0648\u062a\u060c \u0648\u0627\u0644\u0636\u063a\u0637 \u0627\u0644\u062e\u0644\u0641\u064a\u060c \u0648\u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631\u060c \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0637\u0644\u0628 \u0639\u0631\u0636 \u0627\u0644\u0633\u0639\u0631.<\/p>","protected":false},"author":2,"featured_media":56877,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[77],"tags":[],"class_list":["post-56812","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-applications-industry-guides"],"_links":{"self":[{"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/posts\/56812","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/comments?post=56812"}],"version-history":[{"count":0,"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/posts\/56812\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/media\/56877"}],"wp:attachment":[{"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/media?parent=56812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/categories?post=56812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zobai.com\/ar\/wp-json\/wp\/v2\/tags?post=56812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}